Dependency bumps run as valley jobs, one change per input, instead of GitHub workflows that force-push one shared branch. The first customers are the deployment project's bumps of the-valley and klaus.
Once klaus, the-valley and the deployment's other dependencies land through approval-gated integration, a bump of one of them is a consequence of changes already approved, so it can land on checks alone (autonomy ladder step 4). It still ships through a release.
Done when a bump of the-valley in the deployment project is filed by a job and lands without a coordinator run.
Source: `plan.md`, "Things to keep in view" (dependency-bump automation), "Autonomy ladder" step 4, and Status 2026-10-12 ("Valley jobs").
Comments
contributor2026-11-08 22:24 UTC
Measured: about 25 deployment bumps of the-valley and klaus were coordinator runs, each needing an approval and a converge; a two-line lock bump took 49 min end to end. Between bumps, the host ran a valley version 19 landings behind main for four days, so landed features were not live (oc-a8b43db).
contributor2026-11-10 00:41 UTC
A second use case: updating a project's other inputs on a schedule, such as its package set, which are not valley projects and whose releases raise no event the valley sees.
A deployment project used to update every flake input daily through a forge workflow. When its checks moved to the valley, the workflow went with them, and its inputs went a month without updates. Until valley jobs exist, it runs a weekly host timer that updates every input and uploads one ready change under the job's own key. That timer is a stopgap for this outcome.
What the outcome should cover, beyond bumps of valley-hosted dependencies:
- a schedule, for inputs that raise no event;
- one change per input, or one change for all of them, as the project's policy says;
- a new version of the open update change, rather than a second change, when the last one has not landed.
contributor2026-11-10 03:11 UTC
Found on the first scheduled update: when a job's update fails its checks, an agent can't add a fix version to it. Only the change's owner or an approve-grant holder may add a version. So the fix goes in as a separate change carrying the same lock file, and the job's change is withdrawn by hand once that lands.
This outcome should say how a fix reaches a job's change. Some options:
- named principals may add versions to it;
- a fix stacked on the update lands with it, as one unit;
- the job takes the fixed state on its next run.