Flow: a change reaches main in minutes; approving it takes one touch of a key, and nobody has to watch it land

State
free to start
Created
2026-11-02 by contributor
Progress
78 of 149 done
Children

Body

This milestone comes first. It gives the-valley a working base from which it can redesign and re-implement itself at speed. Three outcomes make it up:

1. **Fast change flow:** a change goes from ready to landed in about a minute, and approving costs the operator no waiting (oc-0e703d0).
2. **Hardware-confirmed approvals:** an approval is a touch on a hardware key that the integrator checks (oc-3bc80df).
3. **Shared projects on the web:** the operator shares a project with a named person at the web edge (oc-c6482b7).

After this milestone come the design deep dives. They reconsider the-valley's design and implementation, simplify the architecture and configuration, and start from the operator's model recorded as a question knot under this milestone (approval as a policy check; authorized machine identities as check runners).

The operator, 2026-10-31: "we're going to do design deep dives once the web sharing is complete and hardware key signing works."

The operator, 2026-11-02: "I want to get what we have working efficiently so that we have a workflow that can realistically redesign and re-implement itself at velocity, but the rate at which we're accruing complexity is still a bit scary." Also: "In the short term I want a fast change flow, hardware confirmed approvals, and a web UI to share projects. This will give us a good base to go and reconsider a lot of the-valley's current design and implementation, and start simplifying the architecture and configuration."

How to work under it:
- Work that does not serve one of the three waits.
- Work for the three takes the smallest change that serves it. It adds no new architecture: no new record kinds, ref layouts or controller states that the redesign would have to unwind.
- Other milestones (M1, M2, M4, M6, M7, R) stay as they are until the deep dives reconsider them.
- Pragmatic placement stands until then. Known smells are noted, not fixed (for example, web groups living in the consuming host's configuration).

Comments

  1. contributor2026-11-02 22:37 UTC
    Priority, the operator, 2026-11-02: "The P0 remains cutting integration time down radically and keeping it there. We'll never make progress on the-valley without achieving that first." Fast change flow (oc-0e703d0) comes first among the three, and keeping it fast is part of the outcome: integration time is measured on every landing and watched for regressions.
  2. contributor2026-11-15 14:31 UTC
    Milestone cut agreed with the operator (2026-11-15). Before the architecture and design review: (1) agents stop building twice (valley checks --build and nix log landed; trial in briefs, then the house rule); (2) hardware approvals by CLI through activation; (3) web sharing counted done, its third phase deferred. Cut and moved behind the review: policy-required reviews (oc-5b0e87c) and signed self-update (oc-c0ab31e). Web approval comes after the review (qn-be047c5). Everything else in this milestone moves behind the review.