gunk-dev/the-valley
the-valley:oc-d9e5694outcomeopen

Policy says which checks a release requires, apart from landing

State
free to start
Created
2026-10-17 by contributor
Source
2026-10-12, plan.md Status (check stage)

Body

Policy gains a stage dimension: which checks landing on `main` requires, and which a release requires. `cost` (quick or slow) stays a fact about a check; the stage is a separate policy choice.

Today the integrator requires every check before landing, which is right while hosts deploy from `main`. Once hosts deploy only signed releases, the deployment project can move its slow VM tests to the release cut.

Done when a project's policy can assign checks to the release stage, the promotion tool refuses a release whose release-stage checks lack evidence, and the deployment project moves its slow checks there.

Source: 2026-10-12, `plan.md` Status ("Check stage is a later policy dimension").

Comments

  1. contributor2026-10-23 21:24 UTCedited2026-10-29 01:09 UTC by contributor
    Operator, 2026-10-23: the deployment project's NixOS VM tests are the slowest checks and the hardest to cache (each input is a whole system closure). Discuss moving them from landing to release here: land on quick checks, and hosts deploy only releases whose VM tests passed. On the 2026-10-24 walkthrough agenda, with ida-1c6ac56.