usage: valley <verb> [args]

valley — S1 integrator verbs for a valley project: author, review, approve, and
track changes and the plan graph.

Authoring and updating changes:
  ready        mark a branch head ready as a new version of its change
  unready      pause a ready change by marking it a draft
  withdraw     mark a ready or draft change withdrawn
  rebase       rebase a change and its stack onto origin/main
  checks       print the checks a diff requires, or ask the worker to build them

Reviewing, approving, and inspecting changes:
  pending      list what needs an approval, in landing order, and what moves
  review       page through a change or stack to approve, rebase, or reject
  approve      run required checks and file an integration request
  status       read a change's integration request and last outcome
  changes      print every recorded change as valley-changes/v1 JSON

Planning work:
  plan         show the project's plan graph as a milestone tree
  knot         read and write knots in the plan graph at refs/the-valley/knots

Bus and client maintenance:
  tail         watch NATS bus events scroll by
  replay       publish ref-updated events for the current refs of a repo
  self-update  build, test, and install the tip of a branch of the-valley
  telemetry    read a valley host's diagnostics over ssh (observe grant)

A change is named by its 32-letter change id, its handle (shortest unique
prefix, at least 4 letters, or <repo>:<handle>), or its branch name.
Runs from any checkout; nix run .#valley bundles git, attest, cue, less, and
natscli (self-update also needs nix). Judgment stays with the human:
nothing here writes main.

`valley --version` prints the package's version and commit (e.g. 0.1.0-97db597,
with -dirty for uncommitted changes, -unknown when nix knew no commit, or
unstamped for a build without the package's stamp).
Run `valley help <verb>` (or `valley <verb> --help`) for a verb's flags and
rules. See docs/reference.md for the full CLI, ref, and schema reference.
