| 10 | # Schedule work from outcomes and their dependencies |
| 11 | |
| 12 | An outcome states something the project wants to achieve. Outcomes can depend on other outcomes. A |
| 13 | scheduler could use that graph to identify ready work, prioritize it, and dispatch the people or |
| 14 | agents able to complete it. |
| 15 | |
| 16 | This adopted sketch connects the knowledge graph to execution. Software development is the first |
| 17 | application; the proposed scheduling structure can also represent other work with explicit |
| 18 | dependencies and completion evidence. |
| 19 | |
| 20 | The [architecture](../../design/architecture.md#work-from-outcomes-and-dependencies) carries the |
| 21 | high-level commitment. This node supplies the reasoning and candidate mechanics. |
| 22 | |
| 23 | ## Dependencies and completion |
| 24 | |
| 25 | The graph already represents blockers through `blocked_by`. The scheduler would read active outcomes |
| 26 | as requested work, rather than requiring a separate manually maintained task queue. |
| 27 | |
| 28 | An outcome such as shipping a feature might depend on implementation and documentation. |
| 29 | Implementation might in turn depend on resolving an authentication defect. Work begins with the |
| 30 | dependencies that can proceed. |
| 31 | |
| 32 | [[dcr-593d3d1]](../decisions/dcr-593d3d1-ideas-are-transitional.md) defines which node states clear |
| 33 | a blocker. Decisions, ideas, bugs, and other outcomes can all block work. A blocker becoming |
| 34 | terminal removes the mechanical block; the parent may still need reassessment when a prerequisite |
| 35 | was abandoned rather than fulfilled. |
| 36 | |
| 37 | The current graph stores status changes in commits. Completion of code work and its outcome update |
| 38 | can therefore be integrated together. Candidate conveniences such as `closes`, reverse `blocks` |
| 39 | edges, and completion events are not all part of the current schema. Any automation they enable must |
| 40 | preserve the same integration path. |
| 41 | |
| 42 | ## Priorities and ready work |
| 43 | |
| 44 | Active root outcomes carry the requested priority. A dependency inherits the highest priority of the |
| 45 | roots that need it. |
| 46 | |
| 47 | The **frontier** is the set of unfinished outcomes whose blockers have cleared. The proposed |
| 48 | scheduler selects from that set, favoring work that advances the highest-priority roots. |
| 49 | |
| 50 | Critical-path scheduling would also need enough information about dependencies and task duration to |
| 51 | identify which work delays completion. Priority propagation alone does not provide a duration |
| 52 | estimate. |
| 53 | |
| 54 | | Concept | Meaning | |
| 55 | | ------------------ | ---------------------------------------------------------------------- | |
| 56 | | Root outcome | A requested result from which demand and priority begin | |
| 57 | | Effective priority | The highest priority inherited from a root that needs the outcome | |
| 58 | | Frontier | Unfinished outcomes with no remaining mechanical blockers | |
| 59 | | Critical path | A dependency chain determining the earliest completion of a root | |
| 60 | | Completion | An accepted state change recording that the outcome's criteria are met | |
| 61 | |
| 62 | ## Dispatch and reconciliation |
| 63 | |
| 64 | A scheduler controller observes node changes and recomputes readiness and priority. |
| 65 | [[ida-b48bded]](ida-b48bded-production-dags-and-events.md) refines this into continuous |
| 66 | reconciliation: events prompt a refresh, while current graph and run state determine what work |
| 67 | remains. |
| 68 | |
| 69 | Dispatch must be idempotent per outcome. Repeated observations must not create several runs for the |
| 70 | same claimed work. |
| 71 | |
| 72 | The sketch proposes recording the claim and run association on the outcome before execution begins. |
| 73 | Only unclaimed, open frontier work would be eligible. The current status spelling is `in-progress`; |
| 74 | run association, leases, and an atomic claim protocol still need a concrete schema and |
| 75 | implementation. |
| 76 | |
| 77 | A dead run must eventually release its claim or be detected as stale. |
| 78 | [[ida-3145b7a]](ida-3145b7a-demand-pressure.md) explores leases, redispatch, and escalation. |
| 79 | |
| 80 | Budgets and loop limits must bound repeated attempts. |
| 81 | [[bd-5cb2034]](../bugs/bd-5cb2034-unbounded-loops-under-demand-pressure.md) examines cumulative |
| 82 | limits, and [[bd-c4d069b]](../bugs/bd-c4d069b-git-churn-from-task-state.md) examines the cost of |
| 83 | frequent coordination writes to Git. The graph makes readiness queryable; it does not by itself |
| 84 | solve those operational problems. |
| 85 | |
| 86 | ## Human attention |
| 87 | |
| 88 | Scheduling answers what work should proceed next. Attention routing also asks which completed work, |
| 89 | failures, and reports a person should see. |
| 90 | |
| 91 | A human decision that blocks an outcome can be scheduled as a request for attention, as proposed in |
| 92 | [[ida-3145b7a]](ida-3145b7a-demand-pressure.md). The broader notification and review problem remains |
| 93 | open in [openquestions.md](../../design/openquestions.md). |
| 94 | |
| 95 | ## Outcomes and bugs |
| 96 | |
| 97 | An outcome is a unit of work with completion criteria. A bug records a problem that may motivate one |
| 98 | or several outcomes. |
| 99 | |
| 100 | Their lifecycles remain distinct. Completing one repair outcome should not automatically close a bug |
| 101 | if other required repair work remains. |
| 102 | |
| 103 | The sketch proposes explicit relationships such as `motivates` and `motivated_by`. A controller |
| 104 | could use them to propose closing a bug when all required outcomes are complete. Those edges and |
| 105 | that behavior still need implementation; status edits must pass through integration. |
| 106 | |
| 107 | This preserves the distinction between explaining a problem and scheduling the work needed to |
| 108 | address it. |
| 109 | |
| 110 | ## Broader use |
| 111 | |
| 112 | The scheduler's dependency traversal does not require a code artifact. Booking tickets after a |
| 113 | budget is approved has a similar dependency structure to implementing a feature after a design |
| 114 | decision. |
| 115 | |
| 116 | Each domain still needs suitable permissions, completion evidence, and handling of changing |
| 117 | circumstances. The structure can be reused without assuming those details are identical. |
| 118 | |
| 119 | [[ida-8482624]](ida-8482624-federation-groups.md) describes the valley and federation context. |
| 120 | [[dcr-2113c52]](../decisions/dcr-2113c52-pr1-relanding.md) records this sketch's place in the |
| 121 | documentation, and [user-scenarios.md](../../design/user-scenarios.md) determines when detailed |
| 122 | scheduling work becomes a priority. |