type: idea id: ida-b48bded status: exploring title: "Combine explicit work dependencies with continuous reconciliation" created: 2026-07-16 source: design conversations, 2026-07-16/17 #

Combine explicit work dependencies with continuous reconciliation #

The project is exploring whether useful outcomes can be represented as dependency graphs whose missing parts are discovered during work. A controller would keep comparing requested outcomes with current state and schedule the work that can proceed.

The graph describes dependencies. Events prompt the controller to refresh its observations. Reconciliation determines what work is still needed.

Discovering the graph #

A build executes a known set of instructions and dependencies. Development often has to discover or create those instructions before the desired artifact can be produced.

The proposal treats that discovery as part of the graph. A task may add a missing implementation, introduce a prerequisite, or refine the conditions for completion. Scheduling must therefore pause and resume as the graph develops, rather than requiring a complete plan at the start.

The distinction studied in Build Systems à la Carte is useful prior art for dependencies discovered during execution.

Human, model, and deterministic work #

Deterministic tasks execute established procedures. Humans and models can supply missing judgments, designs, and procedures. The graph can represent both.

An intended direction is to replace repeated judgment with reliable deterministic work where experience makes that possible. [ida-4557af7] describes specifications and conformance checks that could support that transition.

This is a model to test, not a claim that every task fits neatly into one category or can eventually be automated.

Events and current state #

Events invalidate the controller's observed state and make it reconcile sooner. The dependency graph remains queryable even when no event arrives.

The controller compares active demand with current completion and blockers, then selects the ready work. [ida-3145b7a] describes that continuing demand. Encoding the dependencies only in chains of event handlers would make them harder to inspect and recover.

The architecture separates the event log from workflow control for this reason.

Incidents and repeated revision #

An incident can invalidate the belief that an outcome is satisfied. Reconciliation then identifies the work needed to restore it.

Review and revision can repeat while each artifact version has an acyclic dependency graph. [ida-93e4f91] explores how successive versions remain associated with one intended change.

Completion needs explicit acceptance criteria. Some are mechanically checkable; others still require judgment.

Standing obligations #

A long-running service has requirements over time, rather than one final completed state. Existing convergence systems such as cosmo and Armstrong already maintain such obligations.

How that continuing layer relates to terminating outcome work remains open. It may need no new abstraction, but the relationship must be tested in the effectful-reactions phase.

[ida-eac723e] contains the adopted outcome-DAG sketch that this proposal extends.