| 1 | --- |
| 2 | type: bug |
| 3 | id: bd-e63bac8 |
| 4 | status: open |
| 5 | title: "Define recovery when later verification disproves accepted evidence" |
| 6 | created: 2026-09-01 |
| 7 | source: knowledge base design review, 2026-09-01 |
| 8 | --- |
| 9 | |
| 10 | # Define recovery when later verification disproves accepted evidence |
| 11 | |
| 12 | If a trusted signer supplies false evidence and the problem is found after integration, revoking |
| 13 | that signer does not undo the landed change or its effects. The verification design needs a recovery |
| 14 | procedure for that case. |
| 15 | |
| 16 | This concerns an execution claim that was accepted and later disproved. The integrator already |
| 17 | checks signatures and evidence structure before landing; an invalid signature should be rejected at |
| 18 | that point. |
| 19 | |
| 20 | ## Failure sequence |
| 21 | |
| 22 | A change A lands with a correctly signed claim that a required check passed. B, C, and D may then |
| 23 | land before an independent verifier reruns A's check and finds a different result. |
| 24 | |
| 25 | Revoking the signer limits future reliance on its evidence. The system must still determine which |
| 26 | landed work, deployed state, and pending checks depend on A. |
| 27 | |
| 28 | That impact is not automatically every later commit. It depends on actual code, configuration, and |
| 29 | verification dependencies. A shared foundational change can nevertheless affect a large amount of |
| 30 | later work. |
| 31 | |
| 32 | ## Recovery choices |
| 33 | |
| 34 | Rewriting published history would require coordinating references and the meaning of existing |
| 35 | evidence. It can disrupt consumers and the audit trail. |
| 36 | |
| 37 | An ordinary revert preserves history, but creates another tree that needs verification. Pending |
| 38 | checks become stale where their input closures change. Later changes that depend on A may need |
| 39 | coordinated repair instead of a simple revert. |
| 40 | |
| 41 | A signature or a successful integration verdict does not decide which recovery is correct. |
| 42 | |
| 43 | ## Scope |
| 44 | |
| 45 | Independent background re-verification remains part of the planned trust backstop. This report |
| 46 | identifies an unresolved recovery risk; it does not report a demonstrated cascade in the current |
| 47 | deployment. |
| 48 | |
| 49 | The question matters whenever evidence can be wrong, including a compromised trusted machine or a |
| 50 | faulty check implementation. It is not limited to unfamiliar contributors. |
| 51 | |
| 52 | ## Candidate responses |
| 53 | |
| 54 | Use an intermediate stream and promote work only after additional verification. This changes where |
| 55 | the verification delay is paid. |
| 56 | |
| 57 | Require more verification before accepting evidence from signers with little established standing. |
| 58 | The executor capacity and trust rules need definition. |
| 59 | |
| 60 | Vary admission policy according to the consequences of a change. A documentation path is not |
| 61 | automatically harmless if it contains policy or instructions used by automation. |
| 62 | |
| 63 | The design must define detection, affected-change analysis, deployment response, and recovery |
| 64 | authorization. [verification.md](../../design/verification.md), |
| 65 | [[dcr-439b771]](../decisions/dcr-439b771-integration-occ-over-content-addressed-evidence.md), and |
| 66 | [[dcr-b87f6e8]](../decisions/dcr-b87f6e8-identity-is-a-governed-registry.md) provide the evidence, |
| 67 | integration, and identity context. |