This document indexes unresolved requirements, architectural choices, and detailed design questions. Labels identify those levels. Linked graph nodes carry the fuller reasoning and implementation findings.
Some early questions now have decisions or working implementations. They are summarized under decisions already made so readers can distinguish remaining work from obsolete uncertainty.
[design] First interface scope. What is the smallest useful interface for navigating the
graph, reviewing changes, and improving the project? The
interface proposal
considers editing, private access, selected public views, and browser-based approval. Its scope
and sequence are still open.[design] Migration requirements for each project. Hosting alone does not replace checks,
automation, deployment reads, or browsing. The
Cosmo outcome identifies the
dependencies for the next infrastructure project. Which capabilities must the first migration
deliver, and which can remain in existing tools?[architecture] Verify delegated authority. Agent runs use host-signed provenance and do not
hold their own registry keys. How does an enforcement point verify the recorded chain and the
scope granted to a run? Recording the chain does not establish that it was valid.
Agent authority
and provenance define the
intended distinction.[design] Deliver physical approval. The
core decision
establishes default physical approval and permitted exemptions. The usable signing interface,
exact change identity, envelope, and verification rules still need implementation. The core must
not activate before a person can satisfy it.[architecture] Trust for a new contributor. What evidence permits a previously unknown
signer to contribute? Independent verification, initial restrictions, thresholds, and later
revocation need concrete rules. A lack of history is not evidence of reliability.[architecture] Update and recover the integrator. Previous accepted policy governs ordinary
updates, and the initial installation precedes enforcement. The complete procedure for replacing
broken integration machinery or recovering from compromise of the initial governing identity
remains open.[requirements] Record changes to the system itself. The
self-transparency proposal asks which persistent changes must be
governed and recorded, including emergency repairs outside the normal integration path. Its full
scope and enforcement limits remain unsettled.[design] Credential convergence and expiry. The identity compiler now omits expired machine
keys on a successful compile; the original
non-expiry bug is closed. A
failed convergence can retain older compiled credentials. Provisioning, timely revocation, and
recovery must be tested together. The
access verbs also need
their project and bus enforcement points.[design] Trusted check implementations. The policy resolver reads governing state, but the
attestation and integration tools still evaluate check definitions from the candidate tree. The
check-definition bug
tracks how a mandatory check can be weakened there. How are the canonical tool and required check
definitions distributed, pinned, and enforced at the runner?[architecture] Progress under contention. How does repeatedly invalidated work get a fair
chance to land? The
starvation risk describes the
conditions to measure. Batching, narrower valid input closures, reservations, and faster
verification are candidates, not adopted queue policy.[design] Conflicting notes for a check. The verdict rejects invalid selected evidence. The
collector keeps an admissible note once found, but can replace
earlier invalid evidence with a later admissible note. How should invalid or contradictory notes
be retained and reported so they cannot be silently ignored?[design] Reconsider after governing state changes. The current
request memo compares the request head, target tip, and attestation
namespace. How should changes to the valley floor or accepted signers invalidate a remembered
answer when those three inputs stay unchanged?[architecture] Recover after accepting a false claim. Revocation can restrict a signer's
future work, but does not undo accepted changes or their effects. The
recovery risk asks how to
identify actual dependent work and choose a response. Later commits are not automatically invalid
merely because they follow a bad change.Coordination within a valley shares governance and can use common services. Coordination across valleys must also cross independent policy and access boundaries. Shared infrastructure does not by itself provide atomic integration.
[architecture] Related changes in two repositories. How should a producer and consumer
change be ordered or accepted together? A controller can make one depend on the other, but
dependency ordering alone does not provide an all-or-nothing update. The within-valley design is
deferred; the cross-valley case is later work.[architecture] Feedback from a consumer. If a change in one project breaks another, how does
the failure reach the relevant change discussion? Within a valley this needs routing. Across
valleys it also needs authorized transport and attribution.[architecture] Contribution to a shared project. The-valley is common software but is itself
a project owned by one valley. How does another valley carry changes, attestations, and approvals
to it for evaluation under the owner's policy? The
federation proposal records this case.[architecture] Bus isolation. Should each valley have a bus, or should one bus use
authenticated subjects scoped to each valley? The current bus is local and unauthenticated.
Bus authorization and
host isolation define the
requirements. Sharing a host must not imply sharing event visibility.[design] Mirror credentials. Mirroring another repository needs a credential arrangement.
Per-repository keys and a broader machine account have different access and configuration costs.
The mirror identity proposal records
this choice.[design] Second-valley deployment. The separation model is decided, but Unix naming,
filesystem layout, and the services needing separate users still need concrete configuration and
validation.[architecture] Route human attention. Which events require a person, how urgently, and how
should they be grouped or escalated? Rules, digests, and learned priorities are possible
approaches. Outcome scheduling chooses work; it does not answer this question.[design] Bound continued work. How are repeated attempts, decomposition, and spending
limited across an entire requested outcome? The
unbounded-work risk
explains why per-run budgets alone do not answer this.[design] Retain evidence inputs. Which source inputs, derivations, and outputs must remain
available for independent re-verification, and for how long? Losing a cached output differs from
losing the source needed to rebuild it. Pure evidence has no time-based expiry in the integration
rule, but that does not establish a retention promise.[architecture] Evolve schemas. How do event and statement producers and consumers negotiate
versions and migrations? CUE validates a selected schema; compatibility across versions needs its
own rules.[architecture] Keep cross-system history durable. S4 requires the causes of deployments and
notifications to survive. Records that exist only on the bus cannot be reconstructed from
repository refs. Phase 5 must choose a durable event store or establish replication and recovery
for the relevant bus records.[design] Preserve destructive ref history. Replaying current refs cannot recover all
force-pushes or deletions. Server-side reflogs could retain earlier ref values, subject to their
own expiry and object retention. S6 needs the history that actually occurred, not just a
current-state projection. An incidental filesystem backup of JetStream is not a demonstrated
history-retention contract.[architecture] Store frequent task updates. The
Git churn risk asks whether
high-frequency runtime state belongs in Git. There is no measured workload yet. Any alternative
store must specify what survives failures and which transitions remain auditable.[design] Replace or continue the CLI prototype. The
graduation proposal remains
undecided. Continuing under a specification-coverage rule would require explicitly replacing the
existing size and dependency limits.[design] An effectful-test catalogue belongs with Phase 6: identify which checks can use a
controlled VM or sandbox and which observations inherently depend on the live world. The goal is to
improve what can be independently verified without overstating reproducibility.
[requirements] Public repository discovery remains outside the current scope. It becomes a
question to revisit only if open contribution becomes a supported scenario.
| Earlier question | Current answer | Remaining limit |
|---|---|---|
| Initial replication mechanism | A Git-native publication mirror plus periodic offsite backup | Migration and restore must be repeatable for each project |
| Attestation identity and multiplicity | Tree-digest subjects; separate evidence by signer; sibling signatures over one statement | Retention and independent verification remain open |
| Whether the bus holds repository state | Git holds authoritative repository state; the bus projects it | Current-state replay does not recover all history or external effects |
| How to choose work from project knowledge | Outcomes and dependencies are the adopted direction | Scheduling mechanics, fairness, and spending limits remain open |
| Initial identity model | A governed registry and compiler replace manually maintained key lists | Fine-grained enforcement, delegation verification, and physical approval need work |
The roadmap identifies the scenarios and validation work these questions affect.