gunk-dev/the-valley

dcr-2aa1a12-valley-cli-graduation.md

source79e40051b277main's published tip history
1.2 KiB · Plain text

type: decision id: dcr-2aa1a12 status: proposed title: valley crossed its first graduation tripwire — graduate, or renegotiate the tripwire created: 2026-07-17 source: Phase 1 landing, 2026-07-17 #

valley crossed its first graduation tripwire #

The dependency tripwire in [[dcr-74c3158]] (dcr-74c3158-valley-cli-lifecycle.md) is crossed: the tail and replay verbs need the nats CLI, beyond git and coreutils. The line-count tripwire (~300) is close behind. Per the lifecycle policy, crossing triggers a deliberate decision, recorded here.

Options:

  1. Graduate now — own repo, a real language (Go is the house pattern). Buys tests and robust parsing; costs ceremony while the verb surface is six verbs in one file.
  2. Stay embedded, dependency bundled — nix run .#valley already wraps natscli, so the dependency arrives cleanly; re-arm the tripwire on the next accretion (state, a daemon, subtle behavior needing tests).
  3. Split — graduate the bus-facing verbs (tail, replay) into the future graduated tool, keep the review verbs embedded.

Status: proposed — undecided until reviewed.