A project's birth is a human authorization, signed by a hardware key that requires physical presence, gated through the instance's own policy. A project entering the instance is a change to the instance repository: an addition to its registry entry, its policy, its declaration. Those paths are a path class, and [[dcr-b87f6e8]] (dcr-b87f6e8-identity-is-a-governed-registry.md) already requires human approval as evidence for registry changes. Project birth is that same class, extended to the moment a project first appears.
The pattern is recursive. The instance itself has one genesis entry, created at instance birth. Each project's chain of authority roots in a human signed act that landed through the instance's gate, the same way the instance's own chain roots in its genesis entry. Every delegation chain in every run's provenance ([[ida-a8243d2]] (ida-a8243d2-agent-runs-act-under-delegated-authority.md)) terminates there.
After birth, the human controls which further content requires human approval through the project's
own policy framework. Approval is a requirable evidence type in a path class's requires, exactly
as any other check is ([[dcr-f41f718]]
(dcr-f41f718-declared-verification-policy.md)).
This answers [[ida-b7025b5]]'s
(ida-b7025b5-human-decisions-are-signed-acts.md)
open question of which changes require presence: the classes whose requires names it. Some of that
is floor-mandated — changes to policy itself always require presence — and the rest is
project-tunable, narrowing as trust in non-human authors grows. Enforcement needs nothing new: the
integrator's verdict ([[dcr-439b771]]
(dcr-439b771-integration-occ-over-content-addressed-evidence.md))
verifies an approval statement the same way it verifies any other evidence.
What an approval binds to across a rebase is unresolved, and the two ways of answering it pull apart. Bound to the tree, every queue advance invalidates the approval and re-demands presence — verification latency with a human inside it. Bound to the change's identity, the approval survives a clean rebase while the context beneath it may have shifted underneath the approval without the approver seeing it move. The likely answer is policy-declared: a path class states which binding it demands. That choice makes the open change-identity member of the attestation subject ([[dcr-439b771]]'s (dcr-439b771-integration-occ-over-content-addressed-evidence.md) open item, also carried by [[ida-cbcbb3c]] (ida-cbcbb3c-attestations-bind-to-a-base.md)) load-bearing: an approval wants to name what change it approves, not only which tree. The two open items are one.