When other changes land before a submitted change, the integrator determines which of that change's verification results still apply. It checks that the change can be applied cleanly and that the evidence remains valid for the resulting tree. Checks whose evidence still applies can be reused; the contributor supplies new evidence for the others. The integrator does not run the checks itself.
This is the rule for transferring attestations to a new base, the question raised in [ida-cbcbb3c].
The integrator first tries to apply the change's delta to the current target tip. The delta is the difference the contributor wants to land, as defined in [ida-93e4f91].
A conflict requires the contributor to author a resolution and attest it. Until that resolution exists, the integrator has no resulting tree against which to compare check inputs. A conflict therefore requires new evidence for every required check.
If the change applies cleanly, the integrator evaluates the evidence for each required check. Policy selects the runner and therefore whether the pure or effectful transfer rule applies. An attestation whose declared type contradicts that runner is rejected. Allowing the attestation to choose its own rule would let its author bypass the required verification.
Several signers may have supplied attestations for the same check. The integrator uses the first admissible attestation. An invalid note must not be silently replaced by a valid note found later. Evidence must pass validation before the transfer rules are applied. Forged or malformed evidence ends the judgement with a rejection; it is not treated as a stale result that needs another run.
A pure check produces a deterministic result from content-addressed inputs (verification.md). Its input closure includes all the sources, dependencies, and check definitions used in that computation. The closure has a digest derived from its contents, which the attestation records ([dcr-0de694f]).
The integrator recomputes this digest for the tree that would land:
For example, a documentation change can land while an application change is being checked. If the documentation is outside a particular check's input closure, that check's evidence still applies after the application change is rebased. A change to a dependency inside the closure makes that check's evidence stale even when the rebase has no text conflicts.
Pure attestations do not expire: time is not an input to a pure check. A conflicting result on identical inputs challenges the claimed purity or the evidence. It is handled by the re-verification and trust mechanisms in verification.md.
An effectful check observes mutable external state, such as a running service. That state may change between the observation and integration, including when the check runs immediately before integration. An input digest cannot establish that the observation is still true. Policy instead sets a limit on how old the observation may be.
An effectful result can be reused only when both conditions hold:
A policy class is a named set of path patterns with required checks, defined in [dcr-f41f718]. The validity window follows the same policy layering: a template can supply a default, a project can override an overridable value, and a valley can mandate a value in its floor.
Reading immutable, content-addressed data over a network can still be a pure read. The validity window is needed for observations of mutable state.
When evidence cannot transfer, the integrator emits one request-stale event listing the checks
that need new evidence. The contributor reruns those checks where the change is authored. The
remaining evidence can be reused. This gives the staleness result described in
architecture.md
an explicit set of next actions.
Checking and rechecking happen outside the serialized integration step. That step compares digests and updates the target ref, so it does not wait for test execution.
Each landing records the evidence it used and the integrator's decision:
For the floor's checks, those definitions must come from the valley's own pinned source. The submitted tree must not supply the definitions that judge it. The implementation gap is tracked in [bd-eaefe82].
Every landing gets a transfer statement, even when policy requires no checks. This can happen when all changed paths belong to classes that require nothing, or when the delta touches no paths. The statement explicitly records that no checks were required. The text format cannot represent an empty verdict list, so it uses a line stating that result ([dcr-de9d996]).
The contributor's statement describes the tree it checked. The transfer statement describes the tree that lands. Each is stored under the ref for its subject digest. If the base advanced and the trees differ, the statements occupy two refs; if the trees are identical, they share one ref.
The integrator composes the transfer statement before updating the target ref. If a prerequisite fails before the ref update, the change has not landed and can be considered on a later pass. Once the ref is updated, the change has landed. The integrator then completes its recording steps, reports any failures, and consumes the request so it cannot be processed again as an empty delta.
These rules apply optimistic concurrency control to integration. Contributors work against a fixed tree while other changes proceed. At integration, the system checks whether the assumptions behind their results still hold. A change lands as one unit, and one integrator writes each target stream, establishing a serial order of landed changes.
In database terms, the checked tree is the snapshot, the delta is the write set, and the inputs to the required checks form the read set. Pure checks make that read set explicit through their input closures. Effectful checks use the declared path scope and validity window described above.
An attestation serves as a signed cache entry for a check result. Pure results are keyed by input content; effectful observations have a time limit. Integration determines which entries remain usable on the tree that would land.
The design combines optimistic concurrency control from databases with content-addressed build caching and early cutoff, as used in Nix and Bazel. It uses signed evidence and per-check digests to decide whether earlier verification results apply when a change lands.