From the test-value audit (oc-19345de): the worker's failure handling is tested in three checks; integrator-e2e waits out a fixed 10 s bus deadline four times; two telemetry-e2e subtests re-check approval outcomes valley-request already covers; publish-e2e, ssh-e2e and restack-host-e2e each boot their own machine. Test each behaviour once, in the check that owns its code, wait on events, and boot those three scenarios in one machine. integrator-e2e scenario 27, the one pass from rebase to landing, moves to a watch on main once watches exist. Done when those overlaps are gone and the affected checks' run time drops accordingly.
No comments.