gunk-dev/the-valley
the-valley:oc-9daa661outcomedone

Integrators react promptly to requests, evidence and floor updates

State
done
Created
2026-11-01 by contributor
Blocks
Changes
  • valley:the-valley/qvqwtsosspwvvykuzvpssqzmzoysxqto

Body

Remove the normal integrator polling delay after a committed request, evidence update, change/target ref update or configured instance-floor move. Immediately reconsider requests after a pass lands a change, so dependent requests do not wait another interval. This is a bounded optimization of the existing reconciler under the one-minute latency mission, not a choice of the future authoritative-history store.

Each long-lived controller consumes its own bounded due mark before reading refs, watches its directory in-process, and preserves marks arriving during a pass. Startup and the existing recovery interval repair missed notifications. Repeated claim/watcher errors cannot cause a hot loop. Committed local floor writes explicitly wake dependent projects before network publication; unrelated instance writes do not fan out. Preserve authorization, evidence checks, and worker access/resource boundaries.

Direct compiled-signer-file changes retain the existing recovery interval in this slice. Signer-projects remains a startup input, and the identity compiler's separate schedule remains unchanged. The full controller outcome and authoritative-history question remain open.

Validate real request and evidence publication with a deliberately distant recovery interval, including busy-controller and dependent-landing cases, restart, lost wake, errors, burst coalescing, host permissions and cross-project floor routing. Report publication-to-decision and publication-to-landing measurements. Keep controlled VM measurements distinct from production approval-to-landing latency; do not close the production baseline.

A read-only critic reviewed the brief at 34d12a6791c46ff581b3762b04d61de0743e9ccc. Its corrections are incorporated: Git-persisted memo semantics, immediate follow-up after landing, floor fan-out, claim-failure hold-off, per-project writable directories, and post-receive hooks that never block later hooks. No approval or deployment is included.

Comments

  1. contributor2026-11-01 17:32 UTC
    Coordinator review of qvqw v1 at ed19862f4ef978e086ce3c28a9e93653d7532c26: implementation finished and the author reports passing integrator unit/e2e, module evaluation, prose and publish VM checks. It remains draft. The final cross-model review left a lock-inode replacement race unresolved between acquiring the controller lock and installing the directory watch. The coordinator confirmed that the current code does not revalidate the held descriptor against the watched pathname.
    
    The follow-up must close that window and inspect startup's handling of lock/arm failures before scratch sweeping or reconciliation. Add real filesystem/process regressions, preserve timer fallback for notification failures, and run affected checks on the final fixed head. The author also noted that the last publish VM and module runs preceded its final lock-rule edit. This is a targeted continuation of the same change, not readiness for operator approval yet.
  2. contributor2026-11-01 18:45 UTC
    Change valley:the-valley/qvqwtsosspwvvykuzvpssqzmzoysxqto landed: v2 as 398299eaa0222a811648e21dd6fa0aebb7b3434b.
    
    Every change the knot links has landed and it has no active children, so klaus set it done.