Remove the normal integrator polling delay after a committed request, evidence update, change/target ref update or configured instance-floor move. Immediately reconsider requests after a pass lands a change, so dependent requests do not wait another interval. This is a bounded optimization of the existing reconciler under the one-minute latency mission, not a choice of the future authoritative-history store. Each long-lived controller consumes its own bounded due mark before reading refs, watches its directory in-process, and preserves marks arriving during a pass. Startup and the existing recovery interval repair missed notifications. Repeated claim/watcher errors cannot cause a hot loop. Committed local floor writes explicitly wake dependent projects before network publication; unrelated instance writes do not fan out. Preserve authorization, evidence checks, and worker access/resource boundaries. Direct compiled-signer-file changes retain the existing recovery interval in this slice. Signer-projects remains a startup input, and the identity compiler's separate schedule remains unchanged. The full controller outcome and authoritative-history question remain open. Validate real request and evidence publication with a deliberately distant recovery interval, including busy-controller and dependent-landing cases, restart, lost wake, errors, burst coalescing, host permissions and cross-project floor routing. Report publication-to-decision and publication-to-landing measurements. Keep controlled VM measurements distinct from production approval-to-landing latency; do not close the production baseline. A read-only critic reviewed the brief at 34d12a6791c46ff581b3762b04d61de0743e9ccc. Its corrections are incorporated: Git-persisted memo semantics, immediate follow-up after landing, floor fan-out, claim-failure hold-off, per-project writable directories, and post-receive hooks that never block later hooks. No approval or deployment is included.